Tampa Electric (TECO) solar interconnection: what it requires before you energize

FL (Tampa Bay) · checked 2026-08-03 · request an update

How does Tampa Electric (TECO) detect unpermitted backfeed?

Being verified being verified

What happens if they catch you?

Being verified being verified

Small and DIY interconnection requirements

Florida's statewide tiers apply: Tier 1 under 10 kW has no application fee and no insurance requirement, Tier 2 (10 to 100 kW) carries a $250 fee plus $1M liability coverage, with the declaration page emailed to TECO every year at renewal. documented

Their fussiest requirement is the disconnect switch: manual, visible load break, adjacent to the meter, with a placard reading ON-SITE GENERATION UTILITY DISCONNECT SWITCH engraved or stamped per their electrical standards, and a photo of it goes in with the application. You also formally agree to their Electrical Standards during the application or it can't be submitted. documented

Inspection has a meter-access catch: they ask for 24-hour access, pets secured and gates unlocked, and a $37 fee applies every time an inspection can't be completed, explicitly including a failed inspection and each re-inspection. documented

Netting is Florida's 1:1 retail arrangement, monthly credits roll at full retail, and the annual leftover pays out at avoided cost, a few cents. The 2022 attempt to phase this down was vetoed, so it stands. PTO typically lands 2 to 4 weeks after install. reported

sources: TECO net metering application steps · TECO Tier 2 interconnection agreement (PDF)

Gear for a territory where exports earn little

In Tampa Electric (TECO) territory, exported power earns well below retail, which is why zero-export and self-consumption builds dominate here.

Craftstrom export controller · AP Systems EZ-1 — caps export in hardware

EG4 6000xp / 12000xp — the community-standard inverter for self-consumption builds, mind bypass-mode leakage

Clamp meter · energy monitor — verify zero on your own meter before Tampa Electric (TECO) does

Contains links to our partner sites. As an Amazon Associate we earn from qualifying purchases.

How long does it actually take here?

Loading reported timelines…

Leave PTO empty if you're still waiting. Reports are anonymous and feed the median above.

Related: FPL (FL) · Corn Belt Energy (IL (co-op))

Planning a zero-export or plug-in setup here? See the zero-export reality check and equipment notes.

Every claim above is evidence-graded: documented means it traces to the tariff or the utility's own filings, reported means a dated community report. The full table covers 60 utilities: see all of Gridrules.