All 53 utilities / Sequachee Valley Electric Cooperative
Sequachee Valley Electric Cooperative solar interconnection: what it requires before you energize
How does Sequachee Valley Electric Cooperative detect unpermitted backfeed?
Being verified being verified
What happens if they catch you?
Being verified being verified
Small and DIY interconnection requirements
TVA LPC co-op (about 35,000 members across Marion, Grundy, Sequatchie, and Bledsoe counties), so the TVA framework row applies: no net metering exists, exports only pay through TVA's Dispersed Power Production at avoided cost. documented
Process per their own pages: interconnection application with a line diagram and a copy of the final building permit, State of Tennessee inspections, then written permission to operate. Their PTO clock is unusually fast, typically 5 to 10 business days after paperwork, 30 max, and putting your email on the application speeds it up. documented
Their own caveat: engineering review may find upgrades are needed to support your system, at your cost and with delay. documented
Note for DIYers: every step on their pages says 'your contractor', the process language assumes one throughout. Application fee and buyback specifics are being verified, one call to the co-op pins them down. being verified
sources: SVEC steps to install your system · TVA dispersed power production
Related: Tennessee Valley Authority (TN + 6 states (153 LPCs)) · Knoxville Utilities Board (TN (TVA LPC)) · Xcel Energy (CO)
Planning a zero-export or plug-in setup here? See the zero-export reality check and equipment notes.
Every claim above is evidence-graded: documented means it traces to the tariff or the utility's own filings, reported means a dated community report. The full table covers 53 utilities: see all of Gridrules.