All 53 utilities / AEP Ohio
AEP Ohio solar interconnection: what it requires before you energize
How does AEP Ohio detect unpermitted backfeed?
Being verified being verified
What happens if they catch you?
Being verified being verified
Small and DIY interconnection requirements
Interconnection service agreement signed before install, field verification after. Around $319 meter fee. documented
Exports paid at roughly 11 cents generation-only rate post-HB6, and systems capped at 120% of annual usage, which is why zero-export setups are popular here. documented
sources: AEP Ohio distributed generation
Related: Ohio Edison (OH) · South Central Power (OH (co-op)) · UGI Electric (PA)
Planning a zero-export or plug-in setup here? See the zero-export reality check and equipment notes.
Every claim above is evidence-graded: documented means it traces to the tariff or the utility's own filings, reported means a dated community report. The full table covers 53 utilities: see all of Gridrules.