UGI Electric solar interconnection: what it requires before you energize

PA · checked 2026-07-03 · request an update

How does UGI Electric detect unpermitted backfeed?

Being verified being verified

What happens if they catch you?

Being verified being verified

Small and DIY interconnection requirements

Standard PA PUC Level 1 under 10 kW, owner installation recognized, 1:1 net metering with annual cash-out. documented

Small utility, manual email process, expect patience. reported

sources: PA PUC net metering · PA standard Level 1 form (PDF)

Verify your export before UGI Electric does

UGI Electric nets your exports, but the meter still logs every reverse-flow interval, including ones you didn't plan. Worth knowing your real number before they do.

Clamp meter on the grid input · energy monitor on the export register

Building battery-first or zero-export anyway? Craftstrom · EZ-1 · EG4

Contains links to our partner sites. As an Amazon Associate we earn from qualifying purchases.

Related: Duquesne Light (PA) · PECO (PA) · BGE (MD)

Planning a zero-export or plug-in setup here? See the zero-export reality check and equipment notes.

Every claim above is evidence-graded: documented means it traces to the tariff or the utility's own filings, reported means a dated community report. The full table covers 60 utilities: see all of Gridrules.