Turlock Irrigation District solar interconnection: what it requires before you energize

CA (muni) · checked 2026-07-09 · request an update

How does Turlock Irrigation District detect unpermitted backfeed?

Being verified being verified

What happens if they catch you?

Being verified being verified

Small and DIY interconnection requirements

Not a CPUC utility: TID is a publicly owned irrigation district with board-set rates, so NEM3 and Rule 21 don't apply here. Its old net metering schedules closed when it hit the state cap, and new customers land on Self-Generation rate schedules instead. documented

Those schedules carry a demand charge, billed on your maximum 15-minute interval each month, which most residential customers have never seen. Time-of-use energy charges apply too. documented

Unusual freedom with a catch: system sizes are not limited to your load at this time, but TID reserves the right to study or limit, and virtual net metering is prohibited. documented

Their own warning, verbatim spirit: the District regularly changes rate schedules and these changes could negatively impact your expected return on investment. Believe them. documented

sources: TID self-generation rates · TID go solar

Related: PG&E (CA) · Southern California Edison (CA) · Montana-Dakota Utilities (ND / SD / MT / WY)

Planning a zero-export or plug-in setup here? See the zero-export reality check and equipment notes.

Every claim above is evidence-graded: documented means it traces to the tariff or the utility's own filings, reported means a dated community report. The full table covers 53 utilities: see all of Gridrules.