SDG&E solar interconnection: what it requires before you energize

CA · checked 2026-07-02 · request an update

How does SDG&E detect unpermitted backfeed?

AMI reverse flow documented

What happens if they catch you?

Being verified being verified

Small and DIY interconnection requirements

Rule 21 process, PTO before operation, NEM3 net billing. documented

sources: SDG&E solar application portal · SDG&E net energy metering

Related: PG&E (CA) · Southern California Edison (CA) · Duke Energy (NC / FL)

Planning a zero-export or plug-in setup here? See the zero-export reality check and equipment notes.

Every claim above is evidence-graded: documented means it traces to the tariff or the utility's own filings, reported means a dated community report. The full table covers 53 utilities: see all of Gridrules.