Rocky Mountain Power solar interconnection: what it requires before you energize
How does Rocky Mountain Power detect unpermitted backfeed?
Bidirectional meter rollout underway reported
What happens if they catch you?
Being verified being verified
Small and DIY interconnection requirements
Plug-in systems up to 1.2 kW exempt from interconnection agreements (HB 340, 2025). documented
Larger systems still require an application before operation. documented
sources: Utah HB 340 (2025) · RMP customer generation
Verify your export before Rocky Mountain Power does
Rocky Mountain Power nets your exports, but the meter still logs every reverse-flow interval, including ones you didn't plan. Worth knowing your real number before they do.
Clamp meter on the grid input · energy monitor on the export register
Building battery-first or zero-export anyway? Craftstrom · EZ-1 · EG4
Contains links to our partner sites. As an Amazon Associate we earn from qualifying purchases.
Related: Oncor (TX)
Planning a zero-export or plug-in setup here? See the zero-export reality check and equipment notes.
Every claim above is evidence-graded: documented means it traces to the tariff or the utility's own filings, reported means a dated community report. The full table covers 60 utilities: see all of Gridrules.