Gridrules

All 53 utilities / Consumers Energy

Consumers Energy solar interconnection: what it requires before you energize

MI · checked 2026-07-08 · request an update

How does Consumers Energy detect unpermitted backfeed?

Being verified being verified

What happens if they catch you?

Being verified being verified

Small and DIY interconnection requirements

Same Michigan inflow/outflow framework as DTE: PowerClerk application, commissioning test report, system stays off until permission to operate. Total program plus review fees are capped at $50 by rule. documented

You pay retail for inflow, outflow earns roughly the power-supply component, well below retail, so size to self-consumption. Systems cap at 550 kW or 110% of annual usage. documented

A 2024 improvement DTE doesn't match: since Feb 2024 credits apply to all electric charges, not just the power-supply portion of the bill. documented

Buying a home with a system: program tenure and credits transfer, but only after a New Move In Form plus $25 fee, mailed in, with a fresh agreement drafted within 10 business days. Credits start from when you establish service, not retroactively. documented

sources: Consumers Energy interconnection information · Consumers Energy distributed generation program

Related: DTE Energy (MI (metro Detroit)) · Ohio Edison (OH)

Planning a zero-export or plug-in setup here? See the zero-export reality check and equipment notes.

Every claim above is evidence-graded: documented means it traces to the tariff or the utility's own filings, reported means a dated community report. The full table covers 53 utilities: see all of Gridrules.