ComEd solar interconnection: what it requires before you energize
How does ComEd detect unpermitted backfeed?
Being verified being verified
What happens if they catch you?
Being verified being verified
Small and DIY interconnection requirements
Combined interconnection and net metering application through ComEd's portal, with a certificate of completion and witness test in the flow. No energizing before approval. documented
The big change: systems interconnected after Jan 1, 2025 get supply-only netting under CEJA. Exports earn roughly the 9 to 10 cent supply portion while imports pay full retail, about half the old value. One improvement: credits now roll over indefinitely. documented
Grandfathering trap: pre-2025 systems keep full-retail netting for life, but lose it if a modification forces a new interconnection application, and changing system size, swapping inverter type, or adding a battery all count. Think hard before touching a grandfathered system. documented
The consolation prize: CEJA's smart-inverter rebate pays $300 per kW for solar, more with batteries, potentially $6k+ combined, but the battery rebate requires enrolling in Hourly Pricing, and for grandfathered systems taking the rebate historically meant giving up full-retail netting. documented
sources: Illinois Shines net metering changes FAQ · CUB: what's happening to solar in 2025
How long does it actually take here?
Loading reported timelines…
Leave PTO empty if you're still waiting. Reports are anonymous and feed the median above.
Related: MidAmerican Energy (IA / IL / SD)
Planning a zero-export or plug-in setup here? See the zero-export reality check and equipment notes.
Every claim above is evidence-graded: documented means it traces to the tariff or the utility's own filings, reported means a dated community report. The full table covers 58 utilities: see all of Gridrules.