Capital Electric Cooperative solar interconnection: what it requires before you energize

ND (co-op) · checked 2026-07-09 · request an update

How does Capital Electric Cooperative detect unpermitted backfeed?

Being verified being verified

What happens if they catch you?

Being verified being verified

Small and DIY interconnection requirements

Bismarck-area co-op (Burleigh and southern Sheridan counties), so North Dakota's PSC rules don't bind it, the board sets the terms. Their own page asks members to come to the co-op before signing any contract, and they'll help right-size the array. documented

The co-op pattern applies: interconnection application and agreement through them directly, and expect efficiency-first counseling before they talk panels. documented

Buyback rate and fees are being verified, co-ops publish these in member policies rather than public tariffs. If you're a member, their office quotes it in one call. being verified

sources: Capital Electric interconnection resources · MDU ND avoided cost (for comparison)

Related: Montana-Dakota Utilities (ND / SD / MT / WY) · Alliant Energy (WPL) (WI)

Planning a zero-export or plug-in setup here? See the zero-export reality check and equipment notes.

Every claim above is evidence-graded: documented means it traces to the tariff or the utility's own filings, reported means a dated community report. The full table covers 53 utilities: see all of Gridrules.